Skip to main content

v0.2

Minor Versionm

by Kyle Alberti

  1. Turn off the monitor by rotating the switch in the lower right corner to the OFF position.
    • Turn off the monitor by rotating the switch in the lower right corner to the OFF position.

  2. The PM inlet is held by a ½” Swagelok compression fitting and ships with a cap fitted to prevent debris ingress
    • The PM inlet is held by a ½” Swagelok compression fitting and ships with a cap fitted to prevent debris ingress

    • Remove the cap from Swagelok fitting

    • Press the TSP inlet on to the inlet tube ensuring the o-rings remain in the groove.

    • Insert the PM inlet into the Swagelok fitting and carefully tighten. Thread tape is NOT required.

  3. When you're satisfied the inlet is secure, turn on the monitor by changing the switch back to the MAIN position.
    • When you're satisfied the inlet is secure, turn on the monitor by changing the switch back to the MAIN position.

Conclusion

For further support, contact Technical Support.

One other person completed this guide.

Kyle Alberti

Member since: 04/25/2023

9 Guides authored

Team

Aeroqual Staff Member of Aeroqual Staff

2 Members

9 Guides authored