Dozuki System Automated Release
Minor Versionm
08/17/2022 by Dozuki System
This release was created automatically because the wiki predates the "Wiki Version Control" feature.
Printed Copies Are Uncontrolled
Wiki ID: 112
Author: StJohn Vuetilovoni
Release: Dozuki System Automated Release [Minor]
Revision ID: 1453
Revision Date: 08-17-20
All you need to know to correctly set up and install the AQS 1.
1. Planning - pre-arrival
2. Setup checklist - office
3. Setup checklist - onsite
Attach gas inlet
Attach particle inlet (PCX)
Attach particle inlet (Profiler and Nephelometer)
Change sharp cut cyclone
Choose location
Connect battery (no rotary switch)
Connect battery (rotary switch)
Connect third-party sensor using AUX module
Connect third-party sensor using virtual AUX
Mount monitor to pole
Mount monitor to surveyor's tripod
Mount third-party sensor
Mounting options
Power on and off
Unpack monitor
Upgrade to 4G antenna
Upgrade to power and data interface (PDI)
Wire to mains power
Past 24 Hours: 1
Past 7 Days: 7
Past 30 Days: 13
All Time: 653